PT MODUSTEEL ENGINEERING INDONESIASidoarjo, Indonesia
Modusteel IndonesiamodusteelENGINEERING INDONESIA

Five things to consider for a modular project office.

From room functions to delivery access: start with a clear brief.

Five things to consider for a modular project office.

Sample educational drafts for content development; technical review required before publishing.

1. Define the activities

List activities such as administration, meetings, document storage and guest reception. Use the list to discuss room divisions and furniture needs.

2. Review the site and access

Record ground conditions, delivery vehicle access, unloading areas and assembly space. Technical review is needed before finalising execution plans.

3. Plan utilities

Define electricity, lighting, data, water and sanitation requirements early. Confirm the scope split between the building supplier and project owner.

4. Match the configuration

The catalogue’s 3 × 6 metre module is a discussion reference, not a room-capacity guarantee. Layout must reflect occupancy and technical requirements.

5. Request a detailed quotation

Confirm materials, unit quantities, transport, installation, foundations, tax and agreed scheduling. Catalogue pricing does not automatically represent total project cost.

Source: supplied catalogue and portfolio.

Download catalogue ↗
Discuss your project
MODULAR JOURNAL

Related reading

What is a modular building? Systems and applications explained.Editorial draft

What is a modular building? Systems and applications explained.

Understand how prefabrication turns components into functional spaces.

Read article
Meet the materials: steel frames, rockwool and modular floors.Editorial draft

Meet the materials: steel frames, rockwool and modular floors.

Use catalogue specifications to ask better technical questions.

Read article
Chat on WhatsApp